WEBVTT 00:15.220 --> 00:17.979 Distributed aviation operations is a 00:17.979 --> 00:20.035 method of generating aviation combat 00:20.035 --> 00:21.923 power using a tiered approach for 00:21.923 --> 00:24.257 command and control so that we can task , 00:24.257 --> 00:26.479 organize and make risk decisions at the 00:26.479 --> 00:27.812 correct command level . 00:36.250 --> 00:40.000 MWSS 272 is overall responsible 00:40.000 --> 00:42.680 for operations within the A tech sites . 00:43.580 --> 00:45.619 Site 1 is serving as our Echelon 5 00:45.619 --> 00:47.786 location , meaning that we are kind of 00:47.786 --> 00:49.897 the intermediate between the main air 00:49.897 --> 00:52.063 base , which would be North Carolina . 00:52.063 --> 00:54.008 Site 4 and Site 3 are our outlying 00:54.008 --> 00:56.230 stations or our Echelon 6 sites . We've 00:56.230 --> 00:58.341 been providing the logistical support 00:58.341 --> 00:58.250 to them and we are facilitating 00:58.250 --> 01:00.340 logistical resupplies , maneuver of 01:00.340 --> 01:03.060 forces , housing of aircraft , all to 01:03.060 --> 01:04.849 support the outlying echelon 6 01:04.849 --> 01:07.790 locations . The Bahamas is a good place 01:07.790 --> 01:10.012 for us to practice distributed aviation 01:10.012 --> 01:12.012 operations because it's an adjacent 01:12.012 --> 01:14.123 island chain . It allows us to deploy 01:14.123 --> 01:16.179 forces down here relatively easy and 01:16.179 --> 01:18.346 work through some of the friction that 01:18.346 --> 01:20.401 we may encounter in further fights . 01:20.401 --> 01:22.179 We've also done a little bit of 01:22.179 --> 01:21.989 engineering , uh , horizontal and 01:21.989 --> 01:24.156 vertical construction projects here at 01:24.156 --> 01:26.378 Site One as a thank you to the all tech 01:26.378 --> 01:28.600 personnel for for hosting us and a show 01:28.600 --> 01:30.822 of , you know , relationship building . 01:32.209 --> 01:34.379 So down here specifically we really 01:34.379 --> 01:36.212 focus on forward aviation combat 01:36.212 --> 01:38.435 engineering , which is the construction 01:38.435 --> 01:40.379 of Expedia HLZs . We also have the 01:40.379 --> 01:42.546 ability to refuel aircraft to outlying 01:42.546 --> 01:44.379 stations , specifically site 4 , 01:44.379 --> 01:46.435 capable of providing fuel to assault 01:46.435 --> 01:49.989 support aircraft . Our 01:50.440 --> 01:52.384 operations down here at Atech have 01:52.384 --> 01:54.273 really showcased the untouchables 01:54.273 --> 01:56.107 readiness for deployment and our 01:56.107 --> 01:58.309 ability to adapt to any environment , 01:58.839 --> 02:00.959 uh , in , in future DAO operations .